You could seriously make this with a pair of shears, a drill and a vise. Depending on material cost they could probably be pumped out for about 5 bucks a piece, and someone could probably make at least 100 in a day if not more once you got a process down. It wouldn't cost very much to ship them either, in a very small box, so call it 7-8 bucks shipped tops. Whoever thinks they are getting 80 bucks for a pieces of bent metal I could do in my garage in 10 minutes is smoking something.

